Resurfacing works
Below is a live schedule of upcoming road closures planned for Resurfacing Works.
These works are scheduled to take place during the dates and times below under a full road closure. The roads will be open outside these times and at weekends. If these timings change due to operational requirements, updates will be provided on this page. Please check the dates and times carefully, as this information will be updated throughout the duration of the project.
| Location | Start date | End date |
|---|---|---|
| C77 - Jct C18, Dodge's Orchard to Lower Monkwood Farm (9am to 4pm) | 02/06/2026 | 05/06/2026 |
| Knoll Lane, Loaders (9am to 4pm) | 08/06/2026 | 09/06/2026 |
| Mill Lane, Charminster (9am to 4pm) | 10/06/2026 | 10/06/2026 |
| Higher Charminster (9am to 4pm) | 10/06/2026 | 10/06/2026 |
| West Walks, Dorchester (9am to 4pm) | 11/06/2026 | 11/06/2026 |
| Weymouth Avenue, Dorchester (8pm to 6am) | 15/06/2026 | 18/06/2026 |
| Ringwood Road, Ferndown (Tesco's) (8pm to 6am) | 15/06/2026 | 19/06/2026 |
| South Walks, Dorchester (8pm to 6am) | 18/06/2026 | 22/06/2026 |
| Spa Road, Weymouth (8pm to 6am) | 22/06/2026 | 26/06/2026 |
| Pennys Hill, Ferndown (8pm to 6am) | 22/06/2026 | 26/06/2026 |
| Turbary Roundabout, Ferndown (8pm to 6am) | 29/06/2026 | 03/07/2026 |
| Haywards Avenue, Weymouth (09:00-16:00) | 29/06/2026 | 30/06/2026 |
| Lodmoor Avenue, Weymouth (09:00-16:00) | 01/07/2026 | 02/07/2026 |
| Fleet View, Weymouth (09:00-16:00) | 03/07/2026 | 03/07/2026 |
| B3143 Waterston (09:00-16:00) | 06/07/2026 | 17/07/2026 |
Micro surfacing
Below is a live schedule of upcoming road closures planned for Micro Surfacing.
These works are scheduled to take place during the dates and times below under a full road closure. The roads will be open outside these times and at weekends (unless stated otherwise). If these timings change due to operational requirements, updates will be provided on this page. Please check the dates and times carefully, as this information will be updated throughout the duration of the project.
| Location | Start Date | End Date |
|---|---|---|
| A3030 from Jct A352 to Alweston (9:30am to 3:30pm) | 09/07/2026 | 11/07/2026 |
| B3070 East Lulworth (9am to 4pm) | 11/07/2026 | 12/07/2026 |
| Verwood Road, Woodlands (9am to 4pm) | 22/06/2026 | 24/06/2026 |
| Horton Road to B3081, Woodlands (9am to 4pm) | 24/06/2026 | 25/06/2026 |
| Horton Road to Meadow Hill Cottages, Woodlands (9am to 4pm) | 25/06/2026 | 26/06/2026 |
| Old Sherborne Road, Buckland Newton (9am to 4pm including weekends) | 25/06/2026 | 02/07/2026 |
| A30 Yeovil Road - Babylon Hill W/B Dual Carriageway (9:30am to 3:30pm) | 01/07/2026 | 09/07/2026 |