We want to improve the junction between Abbotsbury Road and B3514 Chickerell Road by reducing the size of the junction bell-mouth and identifying a location for:
a signalled crossing
a parallel crossing
This is to improve safety for pedestrians, particularly school children when crossing.
Project aims
The project includes:
a new signalled puffin crossing on Chickerell Road, giving people a safer place to cross
a new zebra crossing and cycle crossing on Abbotsbury Road so pedestrians and cyclists can cross more safely
new dropped kerbs on Chickerell Road, providing new uncontrolled crossings to make it easier for people using wheelchairs, mobility scooters, pushchairs and bikes
a safer pedestrian crossing point at the entrance to Compass School
changes to the road layout to help slow traffic and improve safety at the junction
a tighter corner to slow vehicle speeds, complemented by a new grassed area and seating
These improvements aim to enhance safety and accessibility for all road users by:
reducing vehicle speeds
improving crossing opportunities
creating a more attractive environment for walking, wheeling and cycling
The scheme will also strengthen connections to local schools, providing safer and more convenient routes for pupils, parents and carers, particularly those travelling to and from Budmouth Academy.
What happens next
Construction is due to start on 7 September 2026 and is expected to last approximately 12 weeks with a completion date by Friday 27 November 2026.
Temporary two-way traffic signals will be used on Chickerell Road during this period to maintain safe access through the area.
A localised signed diversion will be in place during the closure.
Diversion map
Abbotsbury Road / Chickerell Road – road closure: 23 November until 27 November 2026 from 8pm to 6am.
With this sort of work, some noise and inconvenience may be caused. However, we will ensure that it is kept to a minimum. Please let us know as soon as possible if you have any problems during the construction, so we can help resolve any issues that may come up.
We will endeavour to get the work done as quickly as possible.
If any emergencies occur out of normal working hours, please call 01305 221020 where your message will be passed on to the relevant personnel.